STAGE 01 / 04

Strip-out & framing

Week 1–2 · demolition, partitions set out to the approved drawing

Fit-out & joinery · Al Quoz 3, Dubai

We publish the programme. Including the parts we cannot control.

Every fit-out contractor in this city quotes twelve weeks. What separates them is what happens in week six, when the authority has not come back, the stone has not shipped, and someone decides the reception desk should be two metres longer.

BINAA issues the twelve-week bar chart at tender with an owner against every line — and four of those owners are not us. We publish the percentage of our delays that are genuinely our fault, which last year was five. Nobody else in Al Quoz prints that number.

PARTITIONS ◦JOINERY ◦STONE ◦MEP FIRST FIX ◦CEILINGS ◦SHOPFRONTS ◦CIVIL DEFENCE NOC ◦SCREED ◦VENEER ◦GLAZING ◦COMMISSIONING ◦SNAGGING ◦PARTITIONS ◦JOINERY ◦STONE ◦MEP FIRST FIX ◦CEILINGS ◦SHOPFRONTS ◦CIVIL DEFENCE NOC ◦SCREED ◦VENEER ◦GLAZING ◦COMMISSIONING ◦SNAGGING ◦

0

projects handed over since 2014

0%

handed over on the contract date

0%

of delays caused by us, published

0 mo

defects liability on everything we build

Programme · retail unit, 12 weeks

Every bar has an owner. Four of them are not us.

This is the programme we issue at tender, not a marketing version of it. The orange bars are the ones sitting in someone else's queue — an authority, a landlord, a stone supplier — and they are where a twelve-week job becomes a sixteen-week one.

W01
W02
W03
W04
W05
W06
W07
W08
W09
W10
W11
W12

Survey & design freeze

BINAA + DESIGNER

BINAA

Landlord / mall approval

LANDLORD

EXTERNAL

Authority submission

DM / TRAKHEES / DDA

EXTERNAL

Joinery shop drawings

BINAA WORKSHOP

BINAA

Strip-out & partitions

BINAA SITE

BINAA

MEP first fix

BINAA MEP

BINAA

Joinery manufacture

AL QUOZ WORKSHOP

EXTERNAL

Ceilings, screed, finishes

BINAA SITE

BINAA

Joinery install & stone

BINAA SITE

BINAA

MEP second fix & testing

BINAA MEP

BINAA

Civil Defence NOC

CIVIL DEFENCE

EXTERNAL

Snagging & handover

BINAA + CLIENT

BINAA

ORANGE = OUTSIDE OUR CONTROL · DRAG OR SCROLL SIDEWAYS

Delay, 2025 · 34 projects

Where the weeks actually go.

Measured across every job we handed over last year, counted in days lost against the tender programme. The last line is ours.

Authority or landlord approval41%

Submission is made on day two. What happens after that is somebody else's queue.

Client-side changes after freeze27%

A change in week six costs three weeks, not three days, because joinery is already cut.

Long-lead materials18%

Specific stone slabs, imported veneer, bespoke glass. We flag these at tender, in writing.

Access and out-of-hours restrictions9%

Malls that permit work only 22:00–06:00 halve your effective programme.

Us5%

Our own labour, sequencing or errors. We publish this number because most contractors will not.

The Al Quoz workshop
Warehouse 14 · Al Quoz 3

The joinery is ours. That is the whole argument.

Most fit-out companies in Dubai subcontract joinery and then spend the programme chasing it. Ours is eleven people and 9,000 sq ft in Al Quoz 3, which means shop drawings in five working days, a veneer sample before anything is cut, and a reception desk that can be remade in four days when the site survey says the wall is not square.

Send the drawings. You get a rate and a programme, not a brochure.

A budget rate within 48 hours from a layout, a full tender in ten working days from an IFC set.