Six projects, with the awkward one included.

Area, construction cost, status and the thing that was difficult. One of the six is not being built, and it is here because a practice that only shows completed work is hiding most of what architecture is.

Katendrecht Blok B
PROJECT 01In construction

Katendrecht Blok B

Rotterdam-Zuid · Housing · 44 units

Area

4,180 m²

Construction cost

€ 8.9 m

Year

2025

Redline

Won on a competition where we were the only entrant who costed the façade. The winning image is not the one in the brochure — it is the one where the brick returns are drawn at 1:5.

Werkspoor
PROJECT 02Completed

Werkspoor

Utrecht · Adaptive reuse

Area

2,640 m²

Construction cost

€ 5.2 m

Year

2024

Redline

A 1920s hall turned into workshops. The structural survey came back worse than anyone hoped and we spent six weeks redesigning down, rather than pretending the first scheme still stood up.

Huis aan de Maas
PROJECT 03Completed

Huis aan de Maas

Rotterdam · Private house

Area

310 m²

Construction cost

€ 1.1 m

Year

2024

Redline

Refused once by the welstandscommissie on the roof form, redrawn, approved four months later. Both versions are on the permits page, because the refusal taught us more than the approval.

Kop van Feijenoord
PROJECT 04Not proceeding

Kop van Feijenoord

Rotterdam-Zuid · Masterplan study

Area

6.4 ha

Construction cost

Study

Year

2023

Redline

The client shelved it after the interest-rate move in 2023. We are showing it anyway — a practice that only shows built work is hiding two thirds of what architecture actually is.

Schoolstraat 12
PROJECT 05Completed

Schoolstraat 12

Delft · School extension

Area

980 m²

Construction cost

€ 2.4 m

Year

2023

Redline

Built in two summer holidays around a working school. The programme, not the form, was the design problem — and the classroom that got the north light was the argument that took longest.

Hoek van Holland
PROJECT 06Completed

Hoek van Holland

Rotterdam · Coastal pavilion

Area

220 m²

Construction cost

€ 640 k

Year

2022

Redline

Small, salty, and the detail that mattered was a stainless fixing nobody sees. Two years on it looks the same, which is the only review of a coastal building worth having.